cc-tracking/tasks/archive/comcarde/bridge-838/checkin-summary.md
2019-05-21 16:40:16 +01:00

404 B

BRIDGE-838 E2E Tests of Swagger Def

Summary

  • Updated test, simplified the authorisation test. Replaced the older method by using the e2e-helper.

Test Plan

  • Run All tests
  • Run E2E: get All ATPs

Test Results


 E2E: List all ATPs receivable for payee
    Valid path

      ✓ with a valid path

    authorization

      ✓ is required to access the path


  2 passing (605ms)